ClinicalTrials.gg
CompletedNCT03525756Updated Oct 25, 2023

Cystogram Before Removal of Foley Catheter After Repair of Colovesical Fistula

An observational study in Colovesical Fistula, sponsored by Mount Carmel Health System. Completed at 1 site in United States. Open to participants aged 18 Years to 99 Years. Per ClinicalTrials.gov, last updated 2023-10-25.

Sponsored by Mount Carmel Health System · Observational

Study type
Observational
Model
Cohort
Time perspective
Prospective
Enrollment
24
Ages
18 Years to 99 Years
Sex
All
01

Study summary

Colovesical fistulas are well-recognized but relatively uncommon pathology to both the general and colorectal surgeon. It is a complication arising from an underlying primary acute to chronic inflammatory process. Although colovesical fistulas are uncommon, they are associated with significant morbidity, affect quality of life, and may lead to death, usually secondary to urosepsis. Early diagnosis and management is essential.

The purpose of the study is to determine the objective use of cystographic evaluation on postoperative day two to guide early Foley catheter removal post colovesical fistula takedown. The hypothesis is that a cystogram showing no extravasation of contrast on postoperative day two will predict safe removal without increased morbidity.

This is an uncontrolled, single arm trial. Patients who meet criteria to undergo either minimally invasive or open colovesical fistula takedown with sigmoid colectomy, without evidence of the need for bladder repair will be eligible to participate. An indwelling Foley catheter is placed intraoperative and continued postoperative. All patients who consent to participate would undergo a cystogram on postoperative day two. The cystogram will be conducted by a radiologist and technician well-trained in the techniques and interpretation of the study. The colorectal surgery enhanced recovery protocol will be followed on all patients with the exception of the cystogram being conducted on post-op day two. If there is no evidence of extravasation of dye is seen on the cystogram the Foley catheter will be removed. Patients will be monitored closely following catheter removal to ensure self-diuresis.

02

Conditions studied

  • Colovesical Fistula

Browse trials for

Keywords

  • cystogram
  • Foley catheter
03

In context

Intestinal Fistula

18 studies on the registry are indexed under Intestinal Fistula; 2 are open to participants now.

Browse Intestinal Fistula studies →

Lead sponsor

Mount Carmel Health System is the lead sponsor of 12 studies on the registry; none are open to participants now.

Counted across the registry records on this site, refreshed daily.

04

Who can participate

Ages eligible
18 Years to 99 Years
Sexes eligible
All
Accepts healthy volunteers
No
Sampling method
Non-probability sample

Study population

Patients meeting all inclusion and no exclusion criteria being cared for at Mount Carmel Health System

Go through the criteria one by one — yes, no or not sure — and take the list to your doctor or the study team. Kept in this browser only.

Inclusion criteria

  • adult patients with clinical, radiographic, or endoscopic confirmation of a colovesical fistula
  • patients undergoing either minimally invasive or open colovesical fistula takedown with sigmoid colectomy, without evidence of the need for bladder repair

Exclusion criteria

Exclusion Criteria:

  • malignant disease
  • Crohn's disease
  • radiation-induced colovesical fistula
  • current pregnancy
05

Study design

Observational model
Cohort
Time perspective
Prospective
Enrollment
24 participants (actual)
Patient registry
No

Groups and cohorts

  • Cystogram on Post-Op Day 2

    An indwelling Foley catheter is placed intraoperative and continued postoperative. All patients who consent to participate would undergo a cystogram on postoperative day two. The cystogram will be conducted by a radiologist and technician well-trained in the techniques and interpretation of the study. The colorectal surgery enhanced recovery protocol will be followed on all patients with the exception of the cystogram being conducted on post-op day two.

06

What researchers measure

Primary outcomes

  1. Successful Foley Catheter Removal at Day 2

    Defined as no evidence of extravasation of dye is seen on the cystogram on day two, followed by successful self diuresis within 16 hours of Foley catheter removal.

    Time frame: 16 Hours After Foley Catheter Removal

07

Study locations

1 site
  • Mount Carmel Health System
    Columbus, Ohio 43213, United States
08

Timeline

Tracking since Sep 25, 2026
ElapsedEstimatedEstimated, not yet reached

Ran from Dec 2017 to primary completion in Oct 2022, 58 months.

How these figures are worked out, and which studies are left out of them.

Registered
May 3, 2018
First posted
May 16, 2018
StartActual
Dec 1, 2017
Primary completionActual
Oct 18, 2022
CompletionActual
Oct 18, 2022
Last update
Oct 25, 2023
What these dates mean
Start.
When the first participant enrolled; while estimated, when the study expects to open to recruitment.
Primary completion.
When the last participant was examined or treated to collect data for the study's main question, its primary outcome. A study that stopped early gives the date its data collection stopped.
Completion.
When the last participant's last visit took place, for every outcome, secondary ones and side effects included: the end of the study. Often later than primary completion, sometimes the same day.
Actual and Est.
Actual means the registry says the date has happened. Est. (estimated) is a date the sponsor plans or expects. It can still move, and the sponsor is expected to change it to actual once it has passed.
No changes since tracking began. The registry record was last updated on Oct 25, 2023, before this site started recording changes on Sep 25, 2026. Its history is on ClinicalTrials.gov ↗
09

Registry details

Key details

Study ID
NCT03525756
Lead sponsor
Mount Carmel Health System
Responsible party
Sponsor
First posted
May 16, 2018
Start date
Dec 1, 2017
Primary completion
Oct 18, 2022
Completion
Oct 18, 2022
Last update
Oct 25, 2023

Study contacts

Jaswant Madhavan, MD
principal investigator · Mount Carmel Health System

Oversight

Data monitoring committee
No
FDA-regulated drug
No
FDA-regulated device
No
View the source record on ClinicalTrials.gov ↗

Not currently enrolling

This study is completed, as verified in Oct 2023. You cannot join it, but the record below documents what was studied.

Follow this study

Get an email when the registry record changes — status, dates, results — or when someone posts here.

Sign in to follow

Discussion

Questions and observations about this study, from anyone following it. Not medical advice, and not a channel to the study team — their contact details are on the registry record.

Sign in to join the discussion. Reading takes no account; posting does. You choose a display name, and a pseudonym is the default.

Nothing here yet. If you are running this trial, taking part in it, or weighing whether to, this is the place to say so.

Start the discussion